2013-10-18Using landscape stone ground floor during construction Precautions

Landscape landscape stone ground floor is among the main components of a direct impact on the ground floor of the construction of the effect of the overall landscape , landscape company's customers will inquire about the granite stone ground floor construction German problem, the company often sent to the scene to guide the QC construction . We strive to give our customers solve the problem of the construction ground floor , also summarized here , the ground floor construction process is mainly the following points:
1 , chiseling concrete floor should be grass , chiseling depth of 5 to 10 mm , chiseling marks are spaced about 30 mm . After clean floating dust, mortar, oil, producing bulk water brush Major ground.
2 , ground floor construction landscape before playing a good line , crossing the door pops up on the ground at right angles to the baseline , playing the front line should begin to ensure that the inlet for the whole brick, brick placed in non-integer negative angle or pieces of furniture, elastic line vertical and horizontal positioning control lines should pop up .
3 , landscape stone used in construction before the ground floor , the stone should be first soaked dried.
4 , landscape ground floor construction, cement mortar should be full to put on the back of the stone , after paving with a rubber whip knock reality. Also, check with a spirit level correction , wipe the surface of the cement mortar .
5 , landscapes Puwan 2 to 3 hours after rubbing with white cement joints with cement , sand = 1:1 ( volume ratio ) of cement mortar joints to be filled with dense , smooth . Cotton and silk will then use the landscape stone surface wipe.
6 , note. ( A ) must deal with grassroots qualified , may not have surface dust , floating ash. ( 2 ) Landscape stone after soaking dried before use . The Free affect its setting and hardening , the occurrence of hollowing, from the shell and other issues. ( 3 ) paving is complete, 2 to 3 hours may not Exalted . Preferably 3-5 days , avoid walking in its top .

 

Keywords: landscape stone landscape landscape construction ground floor